View Full Version : winter modifications-what are you doing?

12-18-2009, 02:44 PM
like the title says--what are you doing to your Moomba over the winter?

12-19-2009, 12:37 AM
Waiting for my Polk DB651 speakers to arrive, then in spring when theres NOT 2 feet of snow covering my boat i hope to put them in. Come on Spring!!!!

12-19-2009, 12:37 AM
I need to install the Polk cabin speakers. I had the frames of my Fusion tower speakers powder coated and I'm rewiring them so the speakers are powered separately. Need to get a new amp to run them too. Maybe an eq? Basically all stereo stuff!

12-20-2009, 11:00 PM
Going to add some "Moomba" cleats, install the Polk's and finally re-organize my amp situation. :(

I was toying with the idea of adding FAE as well.

12-21-2009, 03:40 PM
I'm definitely going to change the oil and the impeller and put some fresh gas in (short winter here). Oh yeah, add a shiny new wakesurf rope-- thanks, Santa!

12-21-2009, 09:54 PM
I have a 99 Moomba Outback going to add better stereo system and thinking of adding ballast system if I can figure it out:D

12-22-2009, 12:02 PM
I've got some Polk cabin speakers under the tree and am planing to install the new OJ wakeboard prop. 14.25 X 14.5 LC 1 1/8" FUSION 4-blade. Oh.. and it really needs a good cleaning.

12-22-2009, 09:35 PM
I got my new Tower speakers installed.
Got my new Sub system squared away so fare this winter.
Installed all new Polk DB cabin speakers

On the to do list.
install a new amp rack with lighted cooling fans.
relocate the duel batteries to allow more storage in the cubby
tint the windshield
remove the stickers on the side of the boat
install a flush flip nav light on the bow
install a new bow fat sac
install the new 750 bags i have in the rear
redo the ballast pump system with something faster
install a ski locker door handle < get rid of the pin style from the factory
get some retracting nylon straps for the trailer to back of the boat
install Perfect Pass if i can afford it this year

Think that is all. That should keep me busy from now till April when i can go boarding again.

12-22-2009, 09:51 PM

1) go get a carbide hole saw and then the new balast system install begins. ups guy delivered the last parts today:D

2) get rid of a small dock rash:(

3) rewire sloppy amp wiring

4) install impeller

5) make wall rack for boards

6) not sure yet but im looking forward to it